Bottleneck on the ring between Schonenberg and Osterstraße

Bottleneck on the ring between Schonenberg and Osterstraße
ALL

Bocholt (PID). The city ring on Ostwall, between Schonenberg and Osterstraße, is from the 27. to 31. May halfway closed (right lane). At the same time, the pedestrian and bicycle path is completely closed. This is reported by the municipal traffic department.
Reason: At the local construction site sheet piling are set. Pedestrians and cyclists are diverted across the streets Schonenberg-Ostmauer-Osterstraße. In the construction section Tempo 30 applies.

Made in Bocholt

About Made in Bocholt

Made in Bocholt is a news portal. The articles published here consist of press releases from various sources as well as author contributions, which are usually displayed by attribution.