Hemdener Weg blocked on one side

Hemdener Weg blocked on one side
Short

Bocholt (PID). The Hemdener Weg will be restricted to the number 92 in the period from Monday, June 29, 2020 to Friday, July 24, 2020.
Sewer connection work is taking place. Pedestrians can walk past the construction site, the parking strip will sometimes not be usable. Tempo 30 applies.

Made in Bocholt

About Made in Bocholt

Made in Bocholt is a news portal. The articles published here consist of press releases from various sources as well as author contributions, which are usually displayed by attribution.